Power Generator Manufacturer


Problem:
This manufacturer of portable generators has over 40 assembly lines where generators are built. Each line utilizes manual labor and they get their production schedule from a white board over each line. The MRP system provides data to an Excel spreadsheet that is periodically printed by the floor supervisor who then updates over 40 white boards with part number, quantity required, what is coming next, and any other instructions.